Station ultra-rapide, réorganisation du flux de trafic

Cas 03
🇪🇸 Espagne - Aire de service des autoroutes
Station ultra-rapide, réorganisation du flux de trafic

Customer: Javier Morales
Role: Highway Service Area Investor
Industry: Highway Service Area
Selected Product: EVE-SC720D-GN3 (720kW Ultra-Fast Charging Station)

Requirements

– Highway application scenario
– Simultaneous charging for multiple vehicles
– Dynamic power distribution
– Future expansion capability

Solution

EVE-SC720D-GN3
– Input: 380VAC ±15%
– Max Power: 720kW
– Multi-gun dynamic power distribution
– Connector Support: CCS1 / CCS2 / GBT / NACS
– Modular design for scalability

Results

– Daily charging volume increased by 300% per station
– Became a regional EV charging hub
– Dual-revenue model enabled: advertising + charging income

“We are no longer just a service area — we are a new energy hub.”
Javier Morales

Retour en haut

Prendre rendez-vous

Remplissez le formulaire ci-dessous et nous vous contacterons dans les plus brefs délais.